Sign In | Join Free | My spintoband.com
China Dongguan Chuangrui New Energy Co., Ltd logo
Dongguan Chuangrui New Energy Co., Ltd
Value quality, maintain integrity, let products reassure customers, and satisfy customers with services
Verified Supplier

1 Years

Home > Power Supply Test System >

Test Equipment Fast Charge Power Test System And ATE Regular Power Test System

Dongguan Chuangrui New Energy Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Test Equipment Fast Charge Power Test System And ATE Regular Power Test System

Brand Name : Topfer

Model Number : Top-Smart 1100

Place of Origin : China

MOQ : one set

Price : to be discussed

Payment Terms : T/T

Supply Ability : 10 sets /30 days

Delivery Time : 2 to 3 weeks

Packaging Details : wooden crate

Color : gray

simultaneously measurable : 4-16 power supply products

Altitude : 1.7m

Customizable : Yes

Product Usage : Automatic Testing for Adapter Products

Function : Rapidly test the performance of various power supply products.

Contact Now

Test Equipment Fast Charge Power Test System And ATE Regular Power Test System

Main purposes of the ATE (Automatic Test Equipment) conventional power supply testing system:

  1. Quality Detection

    • Parameter Measurement: Accurately measure various parameters of the power supply, such as voltage, current, power, frequency, etc. By comparing with standard parameters, it can be determined whether the output of the power supply is stable and accurate, and relevant quality standards and specifications. For example, when producing computer power supplies, it is necessary to use the ATE system to test the rated voltage and current of the power supply to ensure they are within the allowed error range.
    • Stability Testing: Evaluate the stability of the power supply under different load conditions, working hours, and ambient temperatures. Long-duration load testing can simulate the actual usage situations of the power supply, detecting whether it can continuously and stably output electric energy, and whether there are issues such as voltage fluctuations or sudden current changes. For example, server power supplies need to provide power stably for a long time, and stability testing with the ATE system can help discover potential problems in advance.
    • Reliability Evaluation: Evaluate the reliability and service life of the power supply through methods such as accelerated life testing and temperature cycle testing. These tests can simulate various harsh conditions that the power supply may encounter during long-term use, such as high temperatures, low temperatures, humidity changes, etc., to predict the failure rate and mean time between failures of the power supply.
  2. Function Verification

    • Protection Function Testing: Detect whether various protection functions of the power supply are working properly, such as over-voltage protection, over-current protection, short-circuit protection, over-temperature protection, etc. When the power supply experiences abnormal conditions, the protection functions should promptly cut off the circuit to prevent the power supply and connected devices from being damaged. The ATE system can simulate various fault situations to verify whether the protection functions of the power supply are sensitive and reliable.
    • Start-Up and Shut-Down Characteristics Testing: Test the start-up time, shut-down time, and output characteristics during the start-up and shut-down processes of the power supply. For some equipment with strict requirements for power supply start-up and shut-down, such as servers and generators, this test is crucial. For example, server power supplies need to complete start-up and provide stable power supply in a short time to ensure the normal operation of the server.
    • Special Function Testing: According to different types of power supplies and their application scenarios, test some special functions. For example, the PWM (Pulse Width Modulation) function of switching power supplies and the regulation ratio function of linear power supplies. Through these tests, it can be ensured that the special functions of the power supply meet the design requirements and can satisfy the specific usage needs of certain equipment.

Test Items of the Charger/Power Bank/Mobile Power Supply Automatic Testing System:

Test items Test items
DC output voltage Input voltage ramp
DC output current Input freq. ramp
Peak-Peak noise Tracking
Transient response time Short circuit test
Transient spike Short circuit current
Voltage regulation OV protection
Current regulation UV protection
Turn ON time OL protection
Rise time OP protection
Fall time In-test adjustment
Hold-up time AC cycle drop out
Inrush current test PLD simulation
Power good signal GPIB read/write
Power fail signal 232 read/write
P/S ON signal USB read/write
Power up sequence TTL signal control
Power off sequence Relay control
Effciency Bar code scan
Input RMS current Dynamic test
Input power DC Current under C.V.Mode
Input power factor

DC : specification under C.P.Mode


Test Equipment Fast Charge Power Test System And ATE Regular Power Test System


Product Tags:

ATE Fast Charge Power Test System

      

ATE Regular Power Test System

      
Wholesale Test Equipment Fast Charge Power Test System And ATE Regular Power Test System from china suppliers

Test Equipment Fast Charge Power Test System And ATE Regular Power Test System Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Dongguan Chuangrui New Energy Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0